Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Ford Transit van gets five-cylinder turbodiesel

Mon, 10 Dec 2012

The full-size Ford Transit van that replaces the E-series Econoline in late 2013 will have a turbocharged five-cylinder diesel in its powertrain lineup. Today Ford uses the 3.2-liter engine in the Ranger pickup sold in international markets. The engine, which wears Ford's Power Stroke marketing name for diesel engines, is built in South Africa and will be exported to the Transit assembly plant near Kansas City, Mo.

Toyota GT86 Price & Specs – starts at £24,995

Fri, 30 Mar 2012

Toyota GT86 Price & Spec The Toyota GT86 will cost from £24,995 in the UK and will come in a single spec. GT 86 with auto ‘box will cost £26,495. We already know that the Toyota GT86 will cost £24,995, because Toyota told us so last month.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.